With over 2.400 employees, Fichtner is Germany's leading independent planning and consultancy enterprise. We are global players and tackle challenging projects in more than 100 countries. Among our clients are companies from the sectors of central utility supplies and waste management, international development and commercial banks, investors, public administrations, and energy-intensive industrial enterprises. We offer our clients a unique combination of engineering consultancy with classical management consultancy. We are looking to fill a site position in Abu Dhabi from January 2027 with an experienced
HV Electrical Engineer for large scale photovoltaics (contract based)
Overall Work Tasks
Working as substation electrical engineer with experience in construction and commissioning supervision of 220 kV or higher voltage substations. Responsible for Owner's Engineer supervision of a 400 kV TAQA Transmission substation in Abu Dhabi at PV4 Al Khanza Project, including installation, testing, energization and commissioning. UAE and TAQA transmission experience preferred. Key Responsibilities:
With over 2.400 employees, Fichtner is Germany's leading independent planning and consultancy enterprise. We are global players and tackle challenging projects in more than 100 countries. Among our clients are companies from the sectors of central utility supplies and waste management, international development and commercial banks, investors, public administrations, and energy-intensive industrial enterprises. We offer our clients a unique combination of engineering consultancy with classical management consultancy. We are looking to fill a site position in Abu Dhabi from January 2027 with an experienced
HV Electrical Engineer for large scale photovoltaics (contract based)
Overall Work Tasks
Working as substation electrical engineer with experience in construction and commissioning supervision of 220 kV or higher voltage substations. Responsible for Owner's Engineer supervision of a 400 kV TAQA Transmission substation in Abu Dhabi at PV4 Al Khanza Project, including installation, testing, energization and commissioning. UAE and TAQA transmission experience preferred. Key Responsibilities:
- Supervise construction, installation, testing and commissioning of the 400 kV substation works.
- Monitor installation of HV/MV equipment, transformers, switchgear, cables, protection and control systems.
- Witness testing, pre-commissioning, energization and commissioning activities.
- Review method statements, ITPs, test procedures, test results and commissioning records.
- Ensure compliance with TAQA Transmission requirements, approved designs and applicable standards.
- Coordinate interfaces between the EPC Contractor, TAQA Transmission and other project parties.
- Identify construction/commissioning issues and monitor NCRs, punch lists and corrective actions through closure.
- Support substation energization, handover and final acceptance on behalf of the Owner's Engineer.
- Bachelor's degree Electrical Engineering (or equivalent)
- At least 10 (ten) years of professional experience in HV
- Ability to work independently on-site and coordinate effectively with multidisciplinary teams
- Experience in working on site
- Good knowledge of English in writing, speaking, and listening
- The social benefits are in line with the regulations of the respective location of the Fichtner Group and include a competitive local salary for permanent positions.
- This position can also be filled by a freelance expert.
- Please note that the requirements regarding professional experience for this position are mandatory and that a work permit for the location must also be available when applying.
More Info
Key Skills
Protection and control systems
Energization
ITPs
Cables
Commissioning supervision
Commissioning records
Substation works
HV MV equipment
Test results