- Coordinating with estimation teams to initiate the general construction methodology.
- Development and performing of project work break down structure and recognize the activity codes assignment.
- Detailing the list of project activities and establishment of critical paths.
- Core resources loading, setting the limits of optimum demand, and representing resource allocation histograms
- Visualizing the general expected cash flow and probable deficit.
- Reporting the general methodology and schedule narrative.
- Output all documents related to planning in conformity to tender requirements.
- Prepare narrative of logics used for scheduling and list the include the critical productive rates used.
- Performing the planning tasks related to estimation process for system implementation (SAP).
Establishment of the expected staffing exit plan and the probable impacts to indirect cost in accordance with the proposed timeframes.